Sheet Metal Roof Flashing Details
Also for exposed fastener panels wall panels tiles soffit fascia copping.
Sheet metal roof flashing details. Open wall scupper with hopper. A minimum distance of 2 5mm from the edges of all flashings must be provided away from an adjacent horizontal surface. At the gable edge use a gable or sidewall flashing. To provide a drip edge allow an overhang of 1 to 2 inches at the eave.
More product details close 1 1 2 in. Where flashings need to be site built from sheet metal or flashing membranes the finished installation must follow the fundamental flashing rules of down and out. The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge. This will keep weather out prevent lifting in high winds and provide a neat finished appearance.
Roof edge with low parapet wall. Galvanized steel drip edge flashing in white. To provide a drip edge allow an overhang of 1 to 2 inches at the eave. Download free high quality cad drawings blocks and details of flashing and sheet metal organized by masterformat.
Curbed multiple roof penetration. At the gable edge use a gable or sidewall flashing. Dealing with dips and making clean overlaps metal drip edge flashing is installed on the perimeter of a roof to direct water away from the fascia into the gutters and to keep wind blown rain image. Flashings must always direct water out over the cladding or drainage plane without openings that would allow water to be directed back into the wall.
Gibraltar drip edge flashing can be used with asphalt shingles or metal roofing panels. Flashing exposure with inside fascia. The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge. Roof edge with cant strip.
This will keep weather out prevent lifting in high winds and provide a neat fin ished appearance.