Shingling A Shed Roof Peak
Drive 2d 1 inch roofing nails every 10 inches.
Shingling a shed roof peak. This method will ensure your shed is completely weatherproof. To do this begin on one end of the ridge and place the ridge cap so that the asphalt. One you have covered both sides of the roof you will need to attach a roof ridge shingle. This important piece protects the roof peak from water penetration.
Install drip caps along the rakes on top of the roofing paper. You will know it is time to switch to. It must be completed at the very end of the shingle run to overlap the uppermost shingles and form a weatherproof. Align and install the 2 tab shingle aligned with the next 5 inch higher chalk line.
Begin row 4 with a shingle cut in half 1 and tabs and complete that row. Begin row 5 with the 1 tab shingle and row 6 with the 1 2 tab shingle. Shingles cut into strips. Installing roof shingles as you have just found is straight forward and if done correctly creates a durable watertight and attractive roof for your shed.
Determine when to stop laying three tab shingles and switch to ridge caps. For shingling a shed roof you would require thick shingles nail gun measuring tape chalks roofing paper roofing nails ladder and a razor to trim the unnecessary portion of the shingles. How to finish the top shingle row on a shed roof step 1. Start with a double layer along the eaves and work up toward the ridge the peak of the roof.
Preparing the peak capping a roof is the last thing done during a roofing project. Row 7 begins with a full 3 tab shingle. If you have overlap that s fine. Overlap strips by about 2 inches at the edges and by 4 inches at the ends.
Your last course of shingles should come as close to the top as possible. 1 galvanized roofing nails. Complete the row with 3 tab shingles.